Documents for use by the Central Area of RRI and DTN
Letter to NTS from P&SC dictating inclusion of ICS-213
BoD Report 12-30-13 ECAC Final Report
Main Page of RRI Central: http://www.k6jt.com/RRI/
RRI Digital Operations (RRI-002)
RRI-008 Pactor-3 Characteristics and Implications
RRI Arts of Incorporation RRI Articles of Incorporation
Central US RRI TOR Central Area Terms of Reference
Statement of Work NTS-006 Sent to P&SC in response to directives
NTS-007 Embedding FLMSG Forms within a Radiogram
NTS-005 Cycle 2 CAN and TCC Operation Guidelines
Message Origination and Delivery Guidance (NTS-003)
NTS Response to ECAC Report 14AUG14 (NTS-004)
COVER LETTER TO NTS RESPONSE – FINAL NTS Officials Response to P&SC
AUXFOG_21_November_2013_viewing – Homeland Security Auxiliary Comms document
Adoption of ICS213 Instructions received from P&SC
PROPOSEDStructural&DocRevs13C ARES and NTS Structure Proposals to P&SC
Exhibit_A_Integration13E_wdiag Management integration proposal from NTS Staffs
Exhibit_B_PSCM_RevisionNotes13C PSCM needed change description for structure proposals
ECAC_Report_Commentary NTS Commentary on the ECAC Report
MPG6A9V15AICSG Draft MPG ICS Guidance